≈7,980 ha
Base mapping for three wind farm sites
Demirköy, Kırklareli, Turkey · 2026
Topographic base maps at 1:1000 and 1:5000 for the design and permitting of three wind farms. A C3 grade GNSS network with fabric-target control points was established, and hybrid photogrammetry and LiDAR flights were flown with DJI Zenmuse P1 and Zenmuse L2. Over about 7,980 ha, the 5 cm orthophoto, DEM, contour lines and map sheets were compiled by stereo restitution.
- Area
- ≈7,980 ha
- Scales
- 1:1000 and 1:5000
- Sensors
- Zenmuse P1 and L2
- Orthophoto
- 5 cm GSD
View project →